Pages
Posts by category
- Category: Applied & Industrial Metrology
- Category: Crane Services
- Category: Industrial Storage & Warehousing
- Category: Machinery Moving
- Category: Millwright & Industrial Services
- Category: Press Releases
- Category: Specialized Heavy Rigging & Transportation
- Omega Morgan’s specialized transportation team installs the Blumenauer Bridge in Portland, OR
- Omega Morgan Wins SC&RA Hauling Job of the Year
- Omega Morgan Reroutes a Transformer in Under Two Weeks to Avoid a Potential Disaster
- Omega Morgan Precision Sets a Compressor and Turbine into a Compressor Station With 250 Ton Gantry System
- Omega Morgan’s Specialized Transportation Team Relocates 60,000 pound Fish Trap
- Omega Morgan transports 4 adsorber vessels using specialized tank trailers
- Omega Morgan Executes Complex Transportation Plan On Route to Anaconda, Montana
- Omega Morgan transports a transformer over tricky terrain in Jerome, ID
- Omega Morgan transports massive turbine runners to a remote location in British Columbia
- Omega Morgan transports a shunt reactor to Site C in British Columbia
- Omega Morgan Transports a Tail Gas Drum to Dickinson, North Dakota
- Omega Morgan Safely Completes the Complex Transportation of a Ship Loader in Vancouver, WA
- Omega Morgan builds bridge jumper system in Hillsboro, OR
- Omega Morgan transports and unloads tower sections for 38 wind turbines
- Omega Morgan Hauls 245,000-Pound Steam Reformer from Arizona to Nevada
- Omega Morgan Featured on Discovery’s Highway Thru Hell Show
- Omega Morgan Transports and Distributes 158,000 Pound Transformer Load to 500 PSF
- Omega Morgan Moves 507,000 Pound Transformer from Power Plant to Barge
- Omega Morgan Wins International Award for Tank Haul
- Omega Morgan Solves Complex Compressor Challenge
- Omega Morgan Moves 153 Superloads to Eastern Oregon
- Omega Morgan Transports 1 Million Pound Load
- Omega Morgan Featured in Portside Article
- Omega Morgan’s Specialized Transportation Project Featured in The Seattle Times
- Omega Morgan Completes Treacherous Compressor Move in British Columbia
- Omega Morgan Supports Seattle Public Transit through Specialized Transportation
- Omega Morgan Taps in to Northwest Maritime Industry
- Omega Morgan Delivers Autoclaves to Boeing
- Category: Uncategorized
Case Studies
- The Complete Solution: Storing & Setting Two Air Handlers in Bellevue, WA
- History & Crane Lifts: Relocating an Antique Train Caboose in Kirkland, WA
- Metrology Service Solution: Repairing A Precision Aerospace Machine Tool
- A Unique Lift: Installing a 9,000-Pound Awning in Tigard, OR
- Foundation First: Installing a Dewatering Plant Foundation in Scappoose, OR
- Connecting the City of Portland: Installing the Blumenauer Bicycle & Pedestrian Bridge
- Crossing the Puyallup: Rehabilitating the Veterans Bridge in Puyallup, WA
- A Quick Turnaround: Transporting a 300,000 Pound Transformer from Cornelius, OR
- Precision Required: Using our 250 Ton Gantry to Set a Compressor and Turbine into a Compressor Station
- Special Delivery: Transporting 4 adsorber vessels from the Port of Vancouver
- Passing an Impasse: Transporting a Transformer to Anaconda, Montana
- There’s Always a Way: Transporting a transformer over tricky terrain to Jerome, ID
- Making History: Transporting Massive Turbine Runners to Remote British Columbia
- Special Delivery: Moving Metal Fabrication Equipment in Boise, ID
- A Toast to More Capacity: Installing New Equipment at Woodinville Whiskey Distillery
- A Groundbreaking Transportation Solution for Wind Components
- In a Tight Spot: Removing a 55,000 Pound Transformer with the Riggers 120
- Replacing a slewing bearing on a radial stacker reclaimer during hurricane season
- The Total Package: Moving and Storing 15,000 square feet of Equipment for a Plant Overhaul
- The Impossible Task: building a temporary bridge in a Port Angeles rainforest
- Need a lift? Replacing bearing pads in a parking garage in downtown Portland
- Sliding Into Place: Moving a Transformer at a Portland Substation
- A coordinated effort: transporting and unloading a shunt reactor in British Columbia, Canada
- Lift and Drift: A unique solution for installing power skids at the JE Dunn Data Center
- From Tacoma to Dakota: Loading and Transporting a Tail Gas Drum
- Working Fast and Staying Safe: Erecting Steel at Mirror Lake Elementary School
- Installing a New Rebar Storage Table for Cascade Steel
- Loading and Lashing a Ship Loader in Vancouver, WA
- Warehousing and Storage for a New Data Center
- Keeping pace and keeping safe: transporting components for a new wind farm
- Setting 100,000 pounds of equipment with precision planning at Puget Sound Energy
- Specialized Transportation and Installation of Hot Isostatic Press in Albany, OR
- Spout Removal and Rebuild at an International Grain Terminal
- Overhead Crane Swap at a McMinville Steel Mill
- Installation of a Hot Isostatic Press for Kittyhawk Products in Canby, OR
- Hospital Installs Combination Heat and Power Plant with Help from Omega Morgan
- Transporting a 158,000 Pound Transformer and Slide Gear System at 500 PSF
- Clearing a Warehouse Space in the Coffee Industry
- 507,000 Pound Transformer to Barge Move
- Setting up Equipment for the Northwest Machine Tool Expo
- Moving 22ft Ozone Tanks on a Strict Time Limit
- Setting the 2+U Columns in Seattle
- Roosevelt Kroll Tower Crane Dismantle
- Returning a Portland Warehouse to its Original State
- Complex Compressor Transportation From California to Canada
- Moving a Priceless Mural in Olympia, WA
- Going Heavy for a Transformer Transport Near Portland, Oregon
- 1818 Fairview Tower Crane
- Moving a Suction Dredge in Scappoose, Oregon
- Machinery Moving - Replacing Electrical Transformers on Vashon Island
- Removing a One-Piece Bridge in Tacoma
- Specialized Transportation: Moving a Tunnel Boring Machine in Seattle
- Basement Install at Seattle Central College
- Ship Loader Grain Delivery Spout
- Linde Cold Box
- Vessel Transport & Lift
- Machinery Moving - Trolley Car Relocation
- Specialized Transportation - Treacherous Compressor Move in British Columbia
- Crane Services Seattle Case Study: Grove GMK 5220 All Terrain Crane
- Bridge Crane Machinery Moving Case Study: Trilifter
- Cascade Steel Mill Ladle Turret Replacement Case Study
- Tower Crane Services Case Study
- Export Dock Maintenance & Millwright Services
- Overlake Medical Equipment Machinery Moving Project
- Fight A.L.S. Tank Barge Transportation Case Study
Careers