Heavy Equipment Movers in Boise

Omega Morgan’s Boise machinery moving crews have the experience, equipment, and expertise to safely move heavy machinery and equipment of all sizes. We plan each move around your site, equipment, schedule, and project requirements.

Get a Quote

Full Service Machinery Moving in Boise

Companies throughout Boise trust Omega Morgan with the movement of delicate CNC machinery, industrial equipment, and other high-value assets. Our Boise machinery moving crew takes a planning-first approach to every project, evaluating equipment specifications, access conditions, handling requirements, and potential risks before work begins. 

Industrial Equipment Moving

Omega Morgan provides industrial equipment moving services for machinery of varying sizes, weights, and configurations. Our crews assess the equipment, facility, and access conditions to determine the safest and most efficient approach.

Machinery Rigging

Our Boise rigging crews select the appropriate lifting and rigging methods based on the equipment’s weight, dimensions, center of gravity, and the conditions of the work area. Rigging can also be integrated into a larger machinery moving, installation, or relocation project.

Equipment Installation

Omega Morgan can assist with equipment installation and final positioning, carefully placing machinery according to project specifications. Our crews can coordinate positioning, leveling, and other installation requirements to help ensure equipment is properly placed and ready for the next phase of your project.

Assembly and Disassembly

Our experienced crews can disassemble equipment for transportation and reassemble it at the destination while following established procedures for protecting critical components. We carefully manage the process to help preserve equipment integrity and ensure mechanical, electrical, and control system connections are properly restored.

Turnkey Industrial Plant Relocations

When you need your entire operation moved to a new location, Omega Morgan provides turnkey industrial plant relocation services from a single source. Our Boise-based team can develop a comprehensive relocation plan that accounts for equipment, logistics, sequencing, and the requirements of your facility.

Moving Heavy, Sensitive, and Precision Equipment

Precision machinery and sensitive components can be vulnerable to vibration, shock, contamination, and improper handling during a move. Omega Morgan’s Boise team plans each equipment move around the specific requirements of the machinery, facility, and project, using experienced crews and specialized equipment to handle everything from CNC machines to energy and electrical equipment.

CNC and Machine Tool Equipment

Our Boise crews manage complete turnkey relocations for CNC mills and lathes, utilizing air-caster systems and specialized gantry rigs to navigate tight plant footprints. We also align your equipment to ensure your tools return to precise operational tolerances after installation.

Semiconductor Manufacturing Equipment

We deliver rigging, anti-vibration transport, and specialized gantry sets for high-value wafer fab equipment across Boise’s semiconductor corridor. Our team coordinates closely with facility engineers to navigate strict overhead clearances and contamination protocols without interrupting active production environments.

Metal Fabrication Machinery

From heavy hydraulic presses and mechanical shears to automated fiber laser tables, we deploy heavy-duty forklifts and hydraulic slide systems to move multi-ton metalworking assets safely. We calculate floor-bearing capacities and structural load distributions to maneuver heavy fabrication lines through constrained plant footprints.

Manufacturing and Processing Equipment

We streamline plant relocations for regional food processors, packaging centers, and light industrial facilities by unifying transportation and millwrighting under one schedule. Every move is engineered around your operational shutdown windows to keep facility downtime to an absolute minimum.

Energy and Electrical Equipment

Our team specializes in setting multi-ton transformers, backup generators, and main switchgear lineups on elevated pads and tight utility footprints across Southern Idaho. Using specialized hydraulic gantries and multi-axle heavy transport, we coordinate route approvals and site-specific safety plans for high-voltage energy installations.

Machinery Moving When Space and Access Are Limited

Tight doorways, low overhead clearances, confined work areas, and operating equipment can all create challenges when moving heavy machinery. Omega Morgan’s Boise crew evaluates access conditions before the move and develops a plan around the available space, equipment, and site requirements to safely maneuver machinery into, out of, or through challenging locations.

Site and Access Planning

Before moving equipment, our team evaluates the route from the pickup point to the final location. We consider doorways, corridors, ceilings, structural conditions, floor capacity, turns, elevation changes, and other potential obstacles that could affect the move. This planning helps identify access challenges early and determine the equipment, rigging methods, and sequence needed to complete the move safely.

Selecting the Right Moving Equipment

Depending on the project, Omega Morgan may use specialized rigging and machinery moving equipment such as gantries, forklifts, cranes, hydraulic skidding systems, machinery skates, or other low-clearance and precision-moving equipment. Our Boise team selects the approach based on the machinery, available space, floor conditions, weight, dimensions, and access requirements.

Protecting Existing Facilities and Equipment

Our crews plan around potential hazards and take appropriate measures to protect floors, walls, doorways, equipment, and other sensitive areas along the moving path. We can also coordinate the move around ongoing operations to help minimize unnecessary disruption.

Precision Placement and Alignment  

When equipment must be placed in a precise location, Omega Morgan’s crews use controlled positioning and specialized moving techniques to maneuver machinery into tight spaces and place it according to project requirements. 

Complete Equipment Relocation from Omega Morgan

Machinery moving is a comprehensive service for Omega Morgan’s Boise equipment moving team. Rather than coordinating multiple contractors for planning, rigging, transportation, storage, and installation, customers can rely on one experienced team to manage the moving process from start to finish. Our full-service approach helps simplify complex equipment relocations while providing a clear plan from the initial project assessment through final placement and installation.

Industrial Logistics and Move Planning

Omega Morgan evaluates your project goals, equipment specifications, facility conditions, access requirements, and moving route to determine the appropriate approach. 

Heavy Lift and Rigging

Our crews can perform the disassembly and rigging required to prepare machinery for movement, then use the appropriate cranes, gantries, forklifts, hydraulic equipment, skidding systems, and other specialized machinery moving equipment to load and maneuver your assets.

Equipment Transport Coordination

When equipment needs to move off site, Omega Morgan can handle the transportation from the existing facility to its new destination. Our team manages the loading, transportation, delivery, and unloading process, accounting for the equipment’s size, weight, and handling requirements. 

Metrology and Precision Alignment

Omega Morgan’s metrology technicians can support equipment installation with dimensional measurement, alignment, and precision calibration services. This helps verify that equipment is properly positioned and aligned according to the requirements of the application.

Temporary Storage and Staging

We offer indoor and outdoor storage and staging options for equipment that needs to be held between phases of a relocation, during facility construction, or while a destination is being prepared. Our storage capabilities accommodate equipment of varying sizes and types, helping keep your relocation on schedule when the move requires temporary staging.

Boise Machinery Moving Project: Metal Fabrication Equipment Installation

When a Boise metal fabrication company needed help receiving two new pieces of equipment, Omega Morgan’s Boise machinery moving team quickly developed a solution, bringing in the right equipment and additional support to complete the delivery effectively. 

Challenge

The customer was preparing to receive a new press brake and shear, each weighing about 28,000 pounds. The challenge was finding a forklift with enough capacity to unload the machines while still being compact enough to maneuver through the doors of the welding and fabrication shop. With no suitable equipment readily available, the customer needed a machinery moving partner that could provide both the equipment and expertise to solve the access challenge.

Solution

Omega Morgan mobilized its Boise machinery moving crew to meet the delivery and brought in a Hoist FR 40/60 forklift suited to the project’s requirements. Because the Boise location was newly established, team members from the Portland location also provided support to ensure the project had the necessary resources. The crews met the line-haul truck, unloaded both machines, and safely maneuvered them into the fabrication shop.

Result

Our team successfully delivered and placed both 28,000-pound machines in the customer’s facility without incident. The quick, efficient response solved an immediate equipment delivery challenge and helped establish a new relationship with the customer for future projects.

Read the Full Case Study

Why Boise Businesses Choose Omega Morgan for Equipment Moving

With decades of experience handling challenging machinery moves, Omega Morgan brings the specialized equipment, experienced crews, and detailed planning needed to manage projects from initial assessment through completion. Our customers value having a single team coordinate the many moving parts of an equipment relocation. They also appreciate our ability to move quickly from planning to execution while maintaining a safety-focused approach.

What We Offer

  • CNC and industrial equipment moves
  • Installation of manufacturing equipment
  • Turnkey plant relocation
  • Assembly and disassembly
  • Heavy machinery transportation
  • Warehousing
  • Machinery moving
  • Machinery rigging
  • Calibration and industrial metrology services

Contact Us

Contact Us


Request a Machinery Moving Quote in Boise

Planning a machinery move in Boise? Omega Morgan can help you determine the right approach, equipment, and resources for your project. Our experienced team can manage the moving process from planning through final placement. Contact Omega Morgan today to discuss your equipment moving needs and request a quote.

This field is for validation purposes and should be left unchanged.
Origin address(Required)
Destination address (if different from origin address)
Drop files here or
Accepted file types: jpg, gif, png, pdf, xls, Max. file size: 10 MB, Max. files: 5.


    Case Studies | Machinery Moving

    Machinery Moving Excellence in Dallas

    Industry Manufacturing

    Equipment Used 2 15k forklifts, 8k forklift, 75-ton rough terrain crane, 75-ton truck crane, 60/80 & 40/60 Versa-Lifts

    Description With a crew of 21, Omega Morgan’s Dallas machinery moving team provided diligent support for a battery energy storage company. The crew spent nine days unloading and rough-setting equipment for installation as well as assembling and installing four 14,000-pound equipment pieces in the customer’s facility.

    Full Case Study

    Case Studies | Machinery Moving

    Moving On Up: Omega Morgan's Machinery Moving Division Provides Heavy Machinery Movers In A Flight Conveyor Upgrade

    Industry Pride Recycling Company / waste processing facility

    Equipment Used Versa-Lift, Rover, Telehandler All-Terrain forklifts

    Description Omega Morgan’s machinery moving division facilitated a conveyor system upgrade at a waste processing facility in Oregon. The project involved moving a 40,000-pound, 65-foot long existing flight conveyor to make space for an additional 38-foot, 30,000-pound horizontal conveyance system. Omega Morgan’s trusted and reliable expertise helped to complete this project ahead of schedule and at a lower cost to their customer.

    Full Case Study

    Case Studies | Machinery Moving

    Out with the Old: Removing and Replacing a Massive Autoclave in Arlington WA

    Industry Manufacturing

    Equipment Used Tri-lifter, jack and skate system, and SPMT.

    Description In the process of upgrading its manufacturing equipment, a telephone pole pressure treating manufacturer needed a full-service company to remove a 160,000-pound autoclave before transporting and installing a new 230,000-pound autoclave in the same place. Omega Morgan’s Seattle machinery moving crew, with support from the specialized transportation and crane teams, delivered a turnkey solution.

    Full Case Study

    Case Studies | Machinery Moving

    Long-Term Machinery Moving: Relocating Over 115 Spindle Machines

    Industry Manufacturing

    Equipment Used Forklifts: 15K, Hoist 40/60, and Versilift 60/80. Tractors: 3 and 4-axle trucks along with lowboy, step deck, and double drop trailers

    Description Relocating to a facility in Lakewood, WA, a manufacturer needed a machinery moving team that could deliver expertise and flexibility over a long time period, without costing production value. Over a year and a half later, Omega Morgan has transported the majority of the components, including 115 spindle machines, while continuing to move one load a week as the job wraps up.

    Full Case Study

    Case Studies | Machinery Moving

    A Speedy Swap: Replacing Three 380,000-Pound Transformers in Seven Days

    Industry Power

    Equipment Used 6-line Self Propelled Modular Transporters (SPMT). 4 100-Ton Computer Controlled Synchronized Jacking Gear. 200 feet of skid beams and 300-ton skid shoes with a push-pull system

    Description After one of its three active transformers failed, a Centralia power generation station realized it needed to swap all three transformers for new components. To avoid the impending power shortage, Omega Morgan’s Seattle machinery moving team swapped the transformers—each weighing 380,000 pounds—in seven days.

    Full Case Study

    Case Studies | Machinery Moving

    The Complete Solution: Storing & Setting Two Air Handlers in Bellevue WA

    Industry Construction

    Equipment Used Tri-Lifter

    Description With construction underway on a new, mixed-use office building in downtown Bellevue, Washington, the builders needed two large air handlers placed — a task that would require skilled heavy lift operators. Omega Morgan not only provided expert machinery moving services, but the complete solution by storing the air handlers in Fife prior to installation. Overcoming height restrictions and other challenges, the machinery moving team delivered a world-class solution.

    Full Case Study

    Case Studies | Machinery Moving

    Special Delivery: Moving Metal Fabrication Equipment in Boise ID

    Industry Metal Fabrication

    Equipment Used Hoist FR 40/60 forklift

    Description When a metal fabrication company was in a bind with an equipment delivery, Omega Morgan’s Boise-based machinery moving crews mobilized to make sure the delivery was a success.

    Full Case Study

    Case Studies | Machinery Moving

    A Toast to More Capacity: Installing New Equipment at Woodinville Whiskey Distillery

    Industry Food and Beverage

    Equipment Used 60-ton boom trucks, Hyster S155 forklifts, Liebherr 160-ton crane

    Description A distillery in Woodinville, Washington, wanted to increase their production capacity. This meant installing a whole new set of equipment in a very tight area. Enter our machinery moving team, ready to assist Wilcox Construction in this exciting new upgrade.

    Full Case Study

    Case Studies | Machinery Moving

    In a Tight Spot: Removing a 55 000 Pound Transformer with the Riggers 120

    Industry Energy

    Equipment Used Riggers 120 Forklift

    Description Live voltage and limited access made removal of a 55,000 pound substation transformer a complicated task without cutting power to many clients. Luckily, our Portland machinery moving crew had just the right solution to keep the lights on and move the transformer safely.

    Full Case Study

    Case Studies | Machinery Moving

    The Total Package: Moving and Storing 15,000 square feet of Equipment for a Plant Overhaul

    Industry Food Packaging

    Equipment Used Tandem Trilifters, Versa lifts, Forklifts

    Description When food packaging giant Crown Holdings needed serious work done at one of their packaging plants, Omega Morgan’s specialized transportation, crane services, millwrighting, machinery moving and industrial storage crews all stepped in to provide a total service solution.

    Full Case Study

    Case Studies | Machinery Moving

    Need a Lift? Replacing Bearing Pads in a Parking Garage in Downtown Portland

    Industry Construction

    Equipment Used (1) 100-ton jacking system, (1) fabricated steel base

    Description Omega Morgan’s machinery moving crews fabricated an efficient engineering solution to replace bearing pads in a damaged parking deck in downtown Portland.

    Full Case Study

    Case Studies | Machinery Moving

    Lift and Drift: A Unique Solution for Installing Power Skids at the JE Dunn Data Center

    Industry Manufacturing

    Equipment Used (1) 200-ton crane, rolling blocks, chain falls, skates

    Description Using a not-often-seen technique that aided with both space and cost savings, Omega Morgan’s Portland-based machinery moving crews assisted with the installation of power skids at the JE Dunn Data Center in Hillsboro, OR.

    Full Case Study

    Case Studies | Machinery Moving

    Overhead Crane Swap at a McMinville Steel Mill

    Industry Steel

    Equipment Used gantry, hydraulic turntable, forklifts, manlifts

    Description Omega Morgan’s Portland-based machinery moving crew executed the move of two, 27.5 ton-capacity overhead double girder bridge cranes for a steel mill in McMinville, OR. The move needed to be completed with minimal disruption to mill operations. Our crew meticulously planned and successfully completed the move, working with only seven inches of clearance and 24 hours of time.

    Full Case Study

    Case Studies | Machinery Moving

    Installing a Hot Isostatic Press in Canby, Oregon

    Industry Fabricated Metal Products

    Equipment Used (4) posts of a 250-ton Gantry

    Description Omega Morgan’s Portland-based machinery moving crews were called upon to install the first of four Hot Isostatic Presses at a brand-new facility in Canby, OR. Faced with a unique rigging challenge and shipping delays, our crews did whatever it took to complete this tricky installation smoothly and on schedule.

    Full Case Study

    Case Studies | Machinery Moving

    Setting up Equipment for the Northwest Machine Tool Expo

    Industry Machining and Manufacturing

    Equipment Used (1) 5k Forklift, (2) 8k Forklifts, (2) 15k Forklifts, (1) 30k Forklift, (1) 23/35 Versa Lift, (1) 40/60 Versa Lift & (3) Gear Trailers

    Description As the official rigging provider for the NW Machine Tool Expo in Portland, Oregon, Omega Morgan’s Machinery Moving team moved 80 various machine tools into place for all of the vendor booths at this year’s event. Even with only two days to set up all the machine tools at the show, our experienced crews tackled this project with ease.

    Full Case Study

    Case Studies | Machinery Moving

    Moving a Priceless Mural in Olympia WA

    Industry Construction

    Equipment Used Airskate system, Grove GMK 5275 crane

    Description Omega Morgan’s machinery moving department was hired by A to B Builders to move a priceless mural, commissioned in 1956, for the city of Olympia, WA. Omega Morgan’s machinery moving and crane teams worked for two days to achieve resounding success. The mural and all its 150,000 glass and stone tiles were transported safely, without a single break or shift.

    Full Case Study

    Case Studies | Machinery Moving

    Machinery Moving – Replacing Electrical Transformers on Vashon Island

    Industry Electrical

    Equipment Used 50T slide gear, 75T tri-lifter, 12K reach forklift

    Description Omega Morgan’s Seattle machinery moving team worked with Puget Sound Energy to replace two old transformers and accessories at the Vashon Island Substation. This project required adapting to challenges including soft ground and a steep grade. In this case study we discuss how we found reliable solutions to successfully and safely complete the project.

    Full Case Study

    Case Studies | Machinery Moving

    Basement Machinery Installation at Seattle Central College

    Industry Electrical / Mechanical

    Equipment Used 60 ton boom truck, Flatbed semi truck

    Description Omega Morgan’s Seattle team was contacted by McKinstry Co., Llc to provide machinery moving services for a generator install project at Seattle Central College. In this case study we recount how our teams worked together to safely remove an old 10,000-pound CAT generator from the college’s basement and replace it with a new CAT generator weighing over 21,000 pounds. From taking out the sidewalk panels and maintaining safe operations in a busy pedestrian area, we were proud of our guys completing the project beyond customer satisfaction.

    Full Case Study

    Case Studies | Machinery Moving

    Machinery Moving – Trolley Car Relocation

    Industry Restaurant

    Equipment Used Gear Rig, Machinery Moving Skates, Pneumatic 30K Forklift, Slide Rails, Jacks, 3 Axle Truck, Lowboy Trailer

    Description OM crews jacked up an antique trolley car and weighed it prior to moving, so that the rigging plan would ensure that moving the car would not damage the floor in the historical building. The crew removed the trolley wheels and set the car onto rails to slide it out of the building. It was lifted and set onto the trailer for transport to its new destination. Crews offloaded the car, set it on skates, and moved it into position in the building. Upon approval, the antique trolley car came off the skates to rest in its final destination.

    Full Case Study

    Case Studies | Machinery Moving

    Bridge Crane Machinery Project Using a TriLifter

    Industry Steel Fabrication

    Equipment Used Trilifter / Versalift 60/80 / Versalift 40/60

    Description Bridge cranes are among the heaviest pieces of equipment in most industrial settings. In this case study we showcase how we lifted, rotated and lowered an existing bridge crane to ground level for maintenance using our Trilifter and put it back in place after the maintenance was completed. Our Steel Fabrication industry client was satisfied with the project that was on time, on budget, and completed exactly as required.

    Full Case Study

    Case Studies | Machinery Moving

    Medical Equipment Machinery Moving at Overlake

    Industry Medical Equipment

    Equipment Used (2) Trilifters, (2) 15k Forklifts, Versalift 40/60, 400ft of floor protection

    Description Our ability to successfully plan, manage, and finalize complicated moves was on display during the Overlake Medical Equipment Moving Project. Our team removed three MRIs and two CT scanners from the 2nd floor of the Overlake Hospital Medical Center and installed one new MRI onsite. The relocated equipment was either prepared for shipment or installed in the Medical Imaging Department on the building’s first floor.

    Full Case Study

    Frequently Asked Questions

    What types of machinery can Omega Morgan move?

    Omega Morgan can move a wide range of heavy, oversized, sensitive, and precision equipment. Our Boise machinery moving team works with CNC machines and machine tools, semiconductor manufacturing equipment, metal fabrication machinery, manufacturing and processing equipment, and energy and electrical equipment.

    Can you move machinery through restricted access areas?

    Yes. Our Boise machinery moving team can plan and execute moves through challenging access conditions, including tight doorways, narrow corridors, limited staging areas, and restricted overhead clearances. We evaluate the equipment, moving path, floor conditions, clearances, and other site constraints to determine the appropriate rigging methods and specialized equipment for the move.

    Can you relocate an entire production line or facility?

    Yes. We provide turnkey machinery and industrial plant relocation services for production lines, manufacturing operations, and entire facilities. Our Boise team can coordinate the planning, disassembly, rigging, loading, transportation, storage, delivery, installation, and reassembly required to move your operation. We manage the relocation as a coordinated project, helping minimize disruption and keep the move on schedule.

    Do you also provide rigging, installation, and alignment?

    Yes. Omega Morgan can manage rigging, equipment installation, and precision alignment as part of a machinery moving or relocation project. Our Boise team can safely lift, maneuver, and position equipment, then assist with installation and final placement. When precision alignment is required, our metrology technicians can provide dimensional measurement, alignment, and calibration services to help ensure equipment is positioned according to project requirements.

    How do you minimize downtime?

    We minimize downtime by planning the move around your operational requirements before work begins. Our Boise team assesses the moving sequence, equipment, labor, transportation, and access requirements in advance so the work can progress efficiently once the move begins.

    Can you manage cross border equipment moves?

    Yes, we can. Omega Morgan can support equipment moves that cross international borders as part of a larger machinery relocation or transportation project. Our teams can handle the logistics involved in moving heavy and specialized equipment between the U.S. and Canada, including transportation planning, permitting, customs coordination, and delivery requirements. This allows customers to work with one experienced team when an equipment move extends beyond the Boise area or across the border.