Making History: Transporting Massive Turbine Runners to Remote British Columbia

INDUSTRY

Hydroelectric energy

EQUIPMENT USED

  • 12 Dolly Dual Lane Trailer
  • Custom-Built Truss Tubes and Widening Beams
  • Custom-Built Reusable Restraint System
  • Jack & Slide System

Omega Morgan was awarded the 2024 Hauling Job of the Year in the 160,000 – 500,000 pounds category by the Specialized Carriers and Rigging Association for our work on a large-scale move of six turbine runners to a remote part of British Columbia.

This project is the biggest hydroelectric infrastructure project to hit British Columbia in the last 100 years. The dam will provide 1,100 megawatts of capacity and about 5,100 gigawatt hours of energy each year to the province.

In 2018, the site needed to prepare to receive massive turbine runners — the components of the dam that are responsible for converting the force of the water into a rotational force that ultimately drives the generator. However, this would be far from a straightforward or simple task. For one, the runners are immense pieces of equipment. Each load transported would total about 770,000 pounds. For another, the dam site is in such a remote location — near Fort St. John — that getting there would involve countless challenges from terrain, planning, and weather.

Omega Morgan’s Canada-based specialized transportation team was thrilled to be called on to lead the charge in getting the six turbine runners where they needed to go safely, soundly, and on schedule. It was an opportunity to be a part of history — and to deliver excellence for our client on a large scale.

TWO YEARS OF METICULOUS PLANNING

Before wheels could hit the ground for this project, our specialized transportation crew had to work with the province to execute a rigorous planning and permitting process. It was critical to be sure the components would make it safely to their destination — and have the least amount of impact possible on the surrounding communities and environment along the way.

The considerations included:

Navigating remote coastal highways. The roads we needed to take to get to Fort St. John were not made to accommodate a haul of this size or this scale. Our crews had to deal with steep rock walls on one side and a drop off on the other. Many of these highways are single lane and very narrow, so we needed to close down a good portion of them on the first two nights of the haul to traverse the highway. Our crew needed to laser measure rock faces, corners, and roundabouts to be extremely precise about how our dual lane trailers would navigate the route — sometimes down to a matter of inches as we cornered along narrow coastal roadways and entered roundabouts in small towns.

Protecting local communities. Between a long and complex permitting process, careful measuring and modeling, and an extraordinary amount of due diligence, our team worked to ensure the local communities would experience as little impact as possible during the moves. During certain portions of the trip, we had to shut down roads to the motoring public in several remote communities. Along with the province of British Columbia, we strove to make sure these shutdowns would last for as short of a time as possible.

This was accomplished with a traffic management plan, meticulously planned and executed, that utilized multiple extra vehicles, sign boards, media blitzes and local news and media spots. This ensured the motoring public were prevented from entering into our crew’s drive line, and kept at a safe distance as we maneuvered through the small communities and highways along our route in the dark of night.

Weather and terrain. Due to the sheer size of the load, the trips could only happen in the wintertime, when the roads were frozen enough to bear the weight of the load. This meant our crews needed to be prepared for wind, rain, and snow — all over narrow roads and steep terrain.

The planning process took about two years to complete. Once we were ready to roll, then the real fun started.

MOVING COMPONENTS FROM WATER TO LAND

The first order of business was to get the turbine runners off the vessel that came in from Brazil at the Port of Prince Rupert, and onto our equipment. We engaged a partner to assist us; by using a derrick crane barge, the turbine runners were offloaded from the shipping vessel and onto our barge. We traversed further into the inlet until we were able to come up onto shore, and from there, our crews used the 350-foot by 110-foot derrick with a 600-ton ringer crane to discharge the runners to the transport units on shore.

This took a significant amount of engineering and planning to execute, particularly during the significant tidal swings in the area that can range in excess of 26 feet from low to high tide. Timing was critical, and the execution of this move was planned to the minute.

CUSTOM-BUILT SPECIALIZED TRANSPORTATION SOLUTIONS

Before ground transport could commence, It was found that the approved trailer would not be able to safely accommodate the turbine runner’s shape and weight. Our engineering team came up with a custom design to expand the trailer’s structural support, which reduces the amount of stress that went onto the trailer by 30-40%. The engineering team also custom-designed batwings to secure the torpedo tubes on the outside of the colossal loads to solve the capacity issue.

As a result of these reconfigurations, the route had to be re-measured to ensure that the trailer would be able to safely navigate the route as originally planned.

Another challenge was securing the turbine runners to the trailer. Nothing could touch the delicate outer surface of the turbine—the only place where it could be secured was at the base. The vertical hold down was the real issue; the engineering team came up with a solution to loop chains underneath and through the center of the turbine, and secure them to the lifting trunnions. They padded the chains with firehose tubing against the inside surface, which was not a sensitive part of the turbine’s construction.

SETTING OFF ON THE FIVE-DAY JOURNEY

Once our specialized transportation crew was ready to roll, it was a five day, four night trip up to the site near Fort St. John. Everything about this journey needed to be absolutely precise. The equipment and the cargo combined were of massive weight and dimension, and we were traveling through many small, remote communities. Every part of the trip had to be planned to the minute.

The traffic management and safety protocols put in place to protect communities and motorists were meticulous and thorough, as were our contingency plans for inclement weather, breakdowns, or other emergencies. Due to the sheer size and length of trailer configuration, there were very few feasible places to stop each evening; everything was carefully mapped out and precisely timed in order to reach the predetermined stopping points on each of the four nights.

And all throughout the trip, our crews navigated 110 bridges, steep inclines and declines, mountains, coastal rain, snow, railroad tracks, and narrow roads. It was one of Omega Morgan’s most challenging hauls to date.

SIX YEARS, SIX TURBINE RUNNERS, 0 INCIDENTS OR INJURIES

From shipment to delivery—and taking into account severe disruptions from winter weather–-the project took six years to complete. Omega Morgan delivered approximately 15,000 man hours to the project, and all six turbine runners made it to the site at Fort St. John without incident or injury.

Thanks to the creativity, ingenuity, expertise, and professionalism of our specialized transportation team, we were able to come through for our customer. We’re grateful for the opportunity to rise to the challenge; we’re more than ready for the next.

4.6 Million Pounds Safely Delivered: Heavy Equipment Hauling Across Wyoming

Industry Electric

Equipment Used 500-ton suspension trailer, hydraulic platform trailer, jack and slide

Description Omega Morgan and IRH completed a large-scale transportation project for the electric industry in Wyoming. The project involved moving seven 670,000-pound transformers from Laramie to Medicine Bow, WY. Using a 500-ton suspension trailer, hydraulic platform trailers, and a jack and slide system, the team delivered superior results.

Full Case Study

Jumping a Bridge: Omega Morgan’s Specialized Transportation Team Does The Impossible

Industry Power

Equipment Used 6-line SPMT trailer, 2 reach forklifts

Description Omega Morgan’s specialized transportation team provided an innovative solution, performing a “bridge jump” to bypass a bridge that could not support the weight of the 179,000-pound transformer they were transporting. In a display of engineering excellence, they constructed a temporary bridge and successfully completed this project for the power industry.

Full Case Study

Mining For Innovation: Transporting a Massive Mining Shovel

Industry Mining

Equipment Used 10-line self-propelled trailer

Description Omega Morgan’s Portland and Boise teams joined forces to assist the mining industry, transporting a nearly 600,000-pound mining shovel up a steep mountain road. Using innovation and experience, the specialized transportation crew safely moved the shovel, helping Omega Morgan’s customer, Simplot, save money and limit equipment downtime.

Full Case Study

Empowering Industry: Omega Morgan's Specialized Transportation Division Moves Six Transformers

Industry Energy / Power

Equipment Used 6-line SPMT 160-ton dual-lane trailer, 2 tri-drive Kenworth tractors, slide gear, 10K reach forklift

Description Omega Morgan’s specialized transportation division moved six transformers weighing nearly 300,000 pounds each from the Port of Portland to northeastern Oregon. The project is an important step in the power industry’s efforts to expand reach and increase service in the eastern region of the state.

Full Case Study

We’ve Got The Power: Moving a 315,500-Pound Transformer From Tacoma To Portland

Industry Specialized Transportation

Equipment Used Kenworth C500, 12 dolly 160-ton dual-lane trailer, Kenworth T800, 550-ton hydraulic crane, Jack and Slide system

Description Omega Morgan’s Portland specialized transportation division moved a 315,500-pound transformer using a 160-ton dual-lane trailer from Tacoma, WA to Portland,OR. Despite size and weight challenges, the team successfully completed the project by providing innovative transportation solutions and by working cohesively with government and local agencies.

Full Case Study

Transporting a 240,000 Lb Autoclave to Arlington, WA

Industry Manufacturing and Distribution

Equipment Used Kenworth T-500 tri-drive tractor and Dolly Walker Trailer (Transport), Liebherr LTM 1300-6.2 360T AT crane, Tadano ATF160G-5 200T AT crane (Loading), Riggers TL150BW Tri Lifter 75T (Offloading)

Description A pressure-treated wood manufacturing and distribution company was in the midst of an important upgrade to their autoclave. The new...

Full Case Study

Out with the Old: Transporting a New Transformer to Moscow ID

Industry Power Distribution

Equipment Used Six-Line Self Propelled Kamag Platform Trailer, Omega Morgan Dual Lane High Frame Trailer, 2000 Western Star Tridrive 550Cat, 2016 Kenworth T800 Tridrive

Description After a transformer failed at a Moscow, ID, substation, Omega Morgan’s specialized transportation team provided OTR heavy hauling for removal and delivery of a new unit. Overcoming permitting requirements, railcar delays, and engineering concerns, our crew developed an innovative solution to deliver the transformer safely and efficiently.

Full Case Study

Multi-Service Solution: Transporting a 255,000-pound transformer from the Port of Tacoma to Central Point OR

Industry Power Distribution

Equipment Used 125-Ton Dual Lane Perimeter Deck Trailer and 400-Ton Slide Gear System

Description Our customer—a logistics and freight forwarding company—had been hired to deliver a 255,000-pound transformer from overseas to a pad in Central Point, OR. Our expert specialized transportation team, with support from machinery moving and logistics, transported the transformer from the Port of Tacoma to the pad safely and efficiently.

Full Case Study

Transporting Over-Dimensional Loads from the Port of Longview to Hillsboro

Industry Technology

Equipment Used 125 and 150-ton dual-lane trailers, sixteen lines of dual-lane platform trailer

Description Nearing the end of their Hillsboro expansion, a technology company needed four over-dimensional loads transported from the Port of Longview to their new location. After ten months of planning, Omega Morgan’s Portland specialized transportation team delivered the loads on time and under budget.

Full Case Study

From Ship to Rail to Pad: Transporting a 474 500-pound transformer from the Port of Portland to Albany OR

Industry Power

Equipment Used six-line Kamag brand SPMT, 10-line platform trailer, 2002 Peterbilt Tri Drive tractor, 12k reach forklift, jack and slide gear.

Description When an international logistics company needed OTR transportation for a massive transformer, Omega Morgan’s Portland specialized transportation team came to the rescue. Our expert team delivered a multi-step heavy haul solution from the Port of Portland to a railcar and finally to the waiting pad—and all before the holiday deadline.

Full Case Study

Transporting Wind Energy Components from the Port of Vancouver to Arlington, OR

Industry Wind Power/Renewable Energy

Equipment Used Aspen and Temisko model double Schnabel

Description When a transport and logistics company faced a shrinking timeline to transport wind energy components from the Port of Vancouver to a distribution center in Arlington, OR, they called in Omega Morgan’s experienced specialized transportation team. Our crew overcame nearby construction challenges and start delays to deliver 82 components in under two months.

Full Case Study

Transporting Four Adsorber Vessels from the Port of Vancouver

Industry Industrial engineering / Manufacturing

Equipment Used 4-axle tractor, (2) specialized transportation tank trailers

Description 4 adsorber vessels needed to get from the Port of Vancouver to our yard in North Plains, OR. Enter our specialized transportation crew and our specialized tank trailers, ready for two nights of safe and efficient transportation.

Full Case Study

Passing an Impasse: Transporting a Transformer to Anaconda Montana

Industry Electrical Power Generation

Equipment Used Kenworth C500 Tractor, High Frame Trailer, Kenworth T800 Tri-Drive Tractor, 6-Line Self-Propelled Line Trailer, Jack and Slide System

Description A rail and rigging company needed to get a transformer to a site in Anaconda, Montana. The only catch? The load was too tall for the route, making it impassable. Enter our specialized transportation team, ready to figure out an expert solution to this transportation challenge.

Full Case Study

A Groundbreaking Transportation Solution for Wind Components

Industry Renewable Energy

Equipment Used (2) 220T Crawler Cranes, (2) 110T Crawler Cranes, Blade trailers, Shuttle line-trailers, Reach lifts, Fork lifts, Double Schnabel, Single Schnabel

Description When jammed transportation routes put a renewable energy customer in a real bind, our specialized transportations crews helped create a solution to transport the components from the Ports of Longview and Vancouver to Alberta, Canada--the first of its kind to be done in the Pacific Northwest.

Full Case Study

From Tacoma to Dakota: Loading and Transporting a Tail Gas Drum

Industry Logistics

Equipment Used (1) 100-Ton Dual Lane Loader trailer, (2) 130-ton mobile cranes: Grove 6300L-1 and Leibherr 1160

Description A logistics company called on Omega Morgan’s specialized transportation crew to assist with an important last minute project--transporting a tail gas drum from the Seattle, WA area to a refinery in Dickinson, North Dakota.

Full Case Study

Keeping Pace and Keeping Safe: Transporting Components for a New Wind Farm

Industry Wind Energy

Equipment Used (2) double Schnabel trailers, (1) single Schnabel trailer, (1) 13-axle perimeter trailer

Description Omega Morgan’s specialized transportation crews hauled tower sections for 38 new wind turbines from Longview, WA to Vail, WA.

Full Case Study

Specialized Transportation and Installation of Hot Isostatic Press in Albany OR

Industry Fabricated Metal Products

Equipment Used 150 ton dual lane transporter, 160 ton dual lane transporter, 125 ton dual lane transporter, (2) 550T cranes

Description Omega Morgan completed the transportation and installation of one of the largest Hot Isostatic Presses in the world in Albany, OR. Our Portland-based specialized transportation, machinery moving and millwright crews were able to make this massively-sized project into one single, efficient mobilization.

Full Case Study

Transporting a 158,000 Pound Transformer and Slide Gear System at 500 PSF

Industry Public Utilities

Equipment Used 100 ton Dual Lane Loader trailer with (2) Tri-Tri tractors

Description Omega Morgan supported the Wildish Building Company when they took on a project to upgrade an existing powerhouse. Wildish Building Company needed to remove two transformers and then install two new larger transformers. The project also required the removal and replacement of a powerhouse deck, and, in order to comply with the limited deck loading, Omega Morgan had to design and build a runway to distribute a 158,000 pound transformer and slide gear system load to 500 PSF.

Full Case Study

Moving 22ft Ozone Tanks on a Strict Time Limit

Industry Construction

Equipment Used 11 axle perimeter deck trailer with low-profile rails, 7 axle perimeter deck tank trailer, pair of 4 axle tractors to pull

Description With only five weeks notice, Omega Morgan did the seemingly impossible: transporting (3) 22-foot wide ozone tanks over 39 miles of mostly rural land in Oregon. With narrow roads and many utilities and wires framing the route, this project definitely earned its SC&RA Hauling Job of the Year award!

Full Case Study

Heavy Transformer Transportation Near Portland, Oregon

Industry Electrical

Equipment Used 300-Ton high-frame trailer, Kenworth C500 semi, (2) Kenworth T800 semis

Description Omega Morgan’s specialized transportation team moved a 460,000 pound transformer nearly 50 miles, using a transport the length of a football field with a total weight of almost one million pounds...

Full Case Study

Moving a Tunnel Boring Machine in Seattle

Industry Heavy Civil

Equipment Used 3 dual lane trailers with low-profile rails

Description Transported (3) TBM components from Husky Stadium to JCM Northlink’s tunnel access site in downtown Seattle. All (3) hauls were made twice in (2) nights with limited hours using Omega Morgan’s dual lane trailers. The trailers were equipped with modified low-profile rails to ensure clearance under the low trolley lines and pedestrian bridges.

Full Case Study

Fight A.L.S. Tank Barge Transportation Case Study

Industry Marine

Equipment Used Hydraulic skidding system, (32) hydraulic jacks & power pack

Description We were asked to assist creating and executing the transport of the Fight A.L.S. tank barge from our customer’s build way to a dry dock where the barge could be prepared for its eventual launch. In this tank barge transportation case study we discuss the unique challenges and solutions for this project and how it was successfully completed.

Full Case Study

Have a Similar Project? Contact Omega Morgan

Get a Quote