Ship Loader Grain Delivery Spout

INDUSTRY

Grain / Port

EQUIPMENT USED

  • Derrick Barge Crane
  • Tugging Service
  • Scaffolding Service
  • (1) 150’ Manlifts
  • Welders

While crane and transport services are core to many operations, our industrial millwright services group deserves its spot in the light. When Kalama Export saw one of its spouts hinder efficient operations, our team from the Portland, Oregon office stepped in to diagnose and solve the problem despite difficult conditions.

This project took the Millwright Division to Kalama Export’s international grain terminal on the Columbia River at the Port of Kalama in Kalama, WA. It operates at 300 million bushels per year, transloading grains from corn and wheat to soybean, millet, oats, and more. The terminal receives shipments via trains, trucks, and river barges. The grains are cleaned and graded, then staged for export into ocean-going ships moving around the world. Two conveyors move product from storage silos to the dock loader gallery, where four articulating spouts pour it into the holds of the vessels.

When one of those spouts stops operating efficiently, the entire operation is compromised. Vessels usually wait at anchor in the river so that as one is leaving full, the other arrives immediately after. Efficiency and reliability is key to plan schedules, maximize predictability, and optimize the entire process.

The Problem: Issues With a Grain Articulating Spout

In April, we received a call from the terminal operator to investigate a potential problem with spout #3. Its slewing motion was reacting with unusual control, and had to remain out of service. As a result, production and filling slowed by 25%, from the usual 48 hours per vessel to 60 hours per vessel.

That reduced output meant that the client could fill notably less than its usual 130 vessels per year, losing significant profit. Delivery to the terminal would have to be either slowed or redirected until the exact problem was discovered and fixed. In other words, quick and thorough work was absolutely essential for everyone involved.

Each of the terminal’s four spouts are designed to articulate through 180 degrees of rotation, from vertical down to 8 degrees above horizontal. The spout itself is a 24″ diameter steel pipe, which telescopes from 60 feet to a full extension of 100 feet. The combined load of the spout pipe assembly is approximately 50,000 pounds when empty.

The Process: Inspection and Complex Repairs

Our first step was to send our industrial services team to the site. The crew performed an inspection, and found that the main support pivot pin responsible for steering and supporting the spout structure was severely fractured, and failure was imminent. Access to the location was difficult, so the crew had to think of a realistic solution that still resolved the issue quickly and permanently.

Omega Morgan arranged a crew, along with a number of items designed for the repairs:

  • an ocean-going barge and tug service
  • scaffolding services
  • a 150′ man lift
  • a derrick barge crane on an emergency basis as support equipment

The flat deck barge and man lift provided river-side access, while the scaffolding provided shore-side access to the work. As a result, we could approach multiple work activities simultaneously. The water crane supported the equipment loading and unloading, as well as additional access to the work elevation as needed. Finally, pad eyes and rigging were employed to support, reposition and control the load while demolition, welding and refurbishment took place.

Because engineering data and drawings were not available from the customer, our team used information derived from field dimensions. We recreated new structural plates on our CNC plasma cutting table, while building a new pivot pin and receiver tube in our shop lathes. Custom-made bronze bearings, establishing critical dimensions for running and interference fits, along with washers, retainer nuts, and bolts were created by Omega Morgan with “just-in-time” delivery for assembly.

The Result: Customer Satisfaction and Full Operation

After the inspection, we were able to complete the repair without injuries or near-miss accidents despite the difficult access point. From start to finish, the project took three days, getting the client’s terminal back up to full capacity. We’re happy to say that we completed the project to full customer satisfaction.

The speed and efficiency at which our Millwright Division–the “Tiger Team”–was able to complete repairs after the inspection was made possible by our existing expertise and various partnerships with the barge crew and other teams. We were able to alleviate a potentially significant problem, and create a fix to last long-term. It’s just another day, #doingtheimpossibledaily.

Millwright Done Right: Emergency Removal of Damaged Conveyor System

Industry Agricultural Commodities

Equipment Used DB Beaver, DB Sea Horse (Hickey Marine), 60’ manlift, 40’ manlift, 12K reach lift (x2), 5K reach lift

Description When a conveyor system at Terminal 5 of the Port of Portland experienced a critical failure, Omega Morgan’s millwright services team got right on the job to quickly—and safely—repair the damage.

Full Case Study

Foundation First: Installing a Dewatering Plant Foundation in Scappoose OR

Industry Construction

Equipment Used Excavator, 10K reach forklift, 60M concrete boom truck

Description When our client’s dredge dewatering system needed to be moved half a mile away to clear the dredging path, Omega Morgan’s millwright team installed one of our largest concrete foundation projects to date — 500 cubic yards — in less than four weeks.

Full Case Study

Installing a New Rebar Storage Table for Cascade Steel

Industry Steel

Equipment Used 12K Reach Forklift, Overhead Bridge Crane

Description Omega Morgan’s millwright services team worked with speed, safety and efficiency to install a new rebar storage table for Cascade Steel Rolling Mill.

Full Case Study

Spout Removal and Rebuild at an International Grain Terminal

Industry Grain Export

Equipment Used 100 Ton Derrick Barge, material barges, 180 foot man lift, 150 foot man lift, 10K reach forklifts, machine shop

Description Our Portland-based millwright services crew was asked to assist with a damaged grain spout at Kalama Export in Kalama, WA. Our team moved fast and worked diligently to remove and rebuild the unstable spout--getting the international grain terminal back up and running quickly.

Full Case Study

Clearing a Warehouse Space in the Coffee Industry

Industry Restaurant

Equipment Used 20K warehouse forklifts, 8K warehouse forklifts, scissor lifts, man lifts, torch sets, hand tools, industrial cranes

Description As part of an acquisition of Boyd’s coffee brand and equipment, Farmer Brothers needed to remove more than 200 heavy pieces of equipment and 550 tons of recycled metals and waste from a warehouse. For help with such a complex project, they turned Omega Morgan to do the job quickly and effectively.

Full Case Study

Returning a Portland Warehouse to its Original State

Industry Solar

Equipment Used 30K warehouse forklifts, 15K warehouse forklift, IC-200 Broderson Carry Deck, 40’ Manlifts, Excavator & Hoe-ram, 35 Ton Boom Truck

Description Omega Morgan’s Millwright team helped GCL Growers move out of a warehouse in Portland. Using a variety of tools ranging from forklifts and manlifts to an excavator and a boom truck, we demolished, moved, cleaned, and even recycled. In this case study we discuss Omega Morgan’s invaluable work on this project.

Full Case Study

Moving a Suction Dredge in Scappoose Oregon

Industry Construction

Equipment Used 150 Ton Lattice Boom Crawler Crane, Grove RT760 Hydro Crane

Description Omega Morgan provided crane assistance, operators, and millwrights to help receive, assemble and move a suction dredge in Scappoose, Oregon. Our teams worked with CalPortland and Dredging Supply Company to safely and efficiently assemble and move this nearly two million pound apparatus from land to water. In this case study we explain Omega Morgan’s work in this two-month assembly and colossal move.

Full Case Study

Cascade Steel Mill Ladle Turret Replacement Case Study

Industry Steel

Equipment Used Tadano ATF 160G (200 Ton Crane), Full Counterweight, Kamag K25 PST 10-Axle Line Towable Hydraulic Platform Trailer, T-800 Kenworth Prime Mover, Aspen 90-Ton Lowbed, Peterbilt 379 Heavy Haul Tractor

Description We partnered with Cascade Steel Mills for a major steel mill ladle turret replacement project. The steel mill ladle turret weighed 62.5 tons and we moved it nearly 200 miles from Tacoma, WA to McMinnville, OR where it was installed. In this case study we outline how we accomplished this task, what equipment we used and how we tackled the moving and installation process.

Full Case Study

Export Dock Maintenance & Millwright Services

Industry Grain Export

Equipment Used 100 Ton Barge Mounted Derrick Crane, Materials Barge, Tugboat, (2) 150’ Manlifts, 12K Reach Forklift, Diesel Welders

Description Our experienced millwright services team was asked to assist a valuable client in the Grain Export industry with installing a new catwalk during their annual dock and ship loader maintenance project. In this case study we discuss how we successfully planned the project in and amongst other projects and dependencies, and how we executed flawlessly the work within our allotted time frame.

Full Case Study