A Quick Turnaround: Transporting a 300,000 Pound Transformer from Cornelius OR

INDUSTRY

Utilities

EQUIPMENT USED

  • 2015 Kenworth C500 prime mover
  • t-bar jeep from our high frame trailer
  • 150 ton trailer with torque tubes
  • 2016 Kenworth T800 tri drive tractor push truck

When the extreme summer heat damaged a transformer at a substation in Sherwood, our Portland-based transportation and logistics services crew was called into action. An electrical utility company in the process of expansion had initially contracted with us to transport a new transformer to a storage facility in Hillsboro. But with an emergency on our hands, our logistics services team worked quickly to reroute the new unit to replace the damaged transformer.

TRANSPORTATION AND LOGISTICS AGAINST THE CLOCK

The new transformer was already aboard the railway to Cornelius when our team learned of the damaged unit. With limited time, we simultaneously searched for available rail and trucking routes. Planning this transportation job would typically take two months. However, as our client and the Sherwood community faced potential power outages in the middle of summer, our transportation and logistics services team found a way to execute with the same level of care and precision in a quarter of the time.

TRANSPORT PLANS VERSUS MURPHY’S LAW

In this industry, you learn to work with Murphy’s Law, especially when you are up against a time constraint. Our initial plan involved the rail company diverting the railcar closer to the Sherwood area. When clearance to the necessary rail spur was unavailable within the required time frame, moving the transformer by truck became the only option. After searching for a viable route and submitting an application, the Oregon Department of Transportation (ODOT) denied our first permit request due to a weight-deficient bridge. Now with even less time available, we had to look for an alternate route. Our transportation and logistics crews spent several nights surveying viable options that would allow a 17’ clearance. Scheduling necessary wire lifting and tree trimming along the final route on short notice only increased the pressure to have this latest plan approved in time. Fortunately, ODOT worked closely with our transportation and logistics team to expedite the process, helping us turn a potential power outage disaster into another successful move.

THE HEAVY HAUL COMES TOGETHER

Finally, the job of loading and transporting the transformer was upon us. The transformer itself measured 33’ long by 11’ wide by 16’ high and weighed 319,670 pounds. Transport required our dual lane perimeter deck trailer with 12 8-tire axles—due to the height and weight—plus a Kenworth C500 in the front to pull and a Kenworth T800 in the back to push. Our transportation and logistics services crew maneuvered the 96 wheeler into position at a nearby rail siding and loaded the transformer onto the trailer.

That evening when there was less traffic on the route, our team operating the trailer was accompanied by four Omega Morgan pilot cars—two in the front and two in the back—and a bucket truck from a local utility provider to help maneuver the transformer under wires and low hanging traffic signals. Arriving at the substation in Sherwood, the crew offloaded the transformer onto a temporary pad. A few days later, when the permanent pad was ready to receive the transformer, our transportation and logistics team completed the move.

Our client was extremely pleased with the outcome and our ability as a logistics trucking company to remain effective in the face of a potential disaster. This project was another example of what experience and teamwork can accomplish as Omega Morgan continues doing the impossible daily.

Case Studies | Logistics

There’s Always a Way: Transporting a Transformer Over Tricky Terrain to Jerome ID

Industry Power Distribution/Energy

Equipment Used (1) 125-ton dual lane perimeter deck trailer, (1) Pull truck, (1) Push truck, (1) 400-ton jack and slide system

Description Our logistics services team stepped up in Boise to help an energy provider transport a new transformer to their facility in Jerome, ID. Though most transformers are nearly identical, no two moves are exactly the same. Our crews had to carefully plan a safe and efficient route for our customer.

Full Case Study

Case Studies | Logistics

A Coordinated Effort: Transporting and Unloading a Shunt Reactor in British Columbia Canada

Industry Energy

Equipment Used 2015 Kenworth C500, 150-ton trailer, push truck

Description Omega Morgan’s transportation and logistics services crews out of Calgary used sharp planning and careful coordination to transport and set a 213,000-pound shunt reactor at a hydroelectric generating station in British Columbia.

Full Case Study

Case Studies | Logistics

507,000 Pound Transformer to Barge Move

Industry Power Generation

Equipment Used 10-line Platform Trailer, Jack & Slide System, 286’ x 78’ Barge, Roro Ramps

Description Our transportation and logistics services crew provided a turn-key solution for a client in need: planning and executing a process to move a 507,000 pound transformer. In addition to jacking and sliding the large transformer onto an Omega Morgan 10-line platform trailer and navigating its transport over a railroad crossing, our team prepared the transformer for transport overseas.

Full Case Study

Case Studies | Logistics

Complex Compressor Transportation From California to Canada

Industry Oil & Gas

Equipment Used Stretch Cozad 9 Axle Trailers, Faymonville HWY MAX

Description Omega Morgan worked with one of the largest North American oil and gas companies to move two 100,000 pound compressors along with more than 25 loads of ship-loose materials from California and two over-dimensional coolers from Texas to Taylor, BC.

Full Case Study

Case Studies | Logistics

Transportation and Logistics – Fraser Surrey Docks Compressor Transport

Industry Oil & Gas

Equipment Used Four-Axle Tractor, 150-Ton Dual Lane Trailer, two tri-drive push trucks

Description We hauled three compressor packages totaling 216’L x 18’W x 15’8”T at 181,000 lbs. from Fraser Surrey Docks, Fraser Surrey British Columbia to the following three locations in BC: Merritt, 93 Mile, and Chilliwack. This project was the heaviest piece permitted and successfully hauled through the British Columbia Interior on the chosen route to date.

Full Case Study

Have a Similar Project? Contact Omega Morgan

Get a Quote