There’s Always a Way: Transporting a Transformer Over Tricky Terrain to Jerome ID

INDUSTRY

Power Distribution/Energy

EQUIPMENT USED

  • (1) 125-ton dual lane perimeter deck trailer
  • (1) Pull truck
  • (1) Push truck
  • (1) 400-ton jack and slide system

A power distribution center in Jerome, ID had encountered a good challenge: growing demand for power in the area. Without enough transformers to provide power, however, the company faced a few risks.  There was a possibility of power outages or increased costs to customers if additional power had to be purchased or brought in from outside the immediate area.

Luckily, the solution was straightforward: they acquired a new transformer from SPX Transformer Solutions. The next major step was getting the transformer from a rail car in Gooding, ID to the facility in Jerome. The journey was short, but height restrictions and tight spots along the route would not make the trip an easy one.

Enter our logistics services crew, giving our Boise office an assist to get the transformer where it needed to be, safely and efficiently. After all, our motto isn’t “we got this” for nothing!

MAPPING THE ROUTE

With our overall transport height being at 18 feet, finding a route that could accommodate that height was the biggest challenge. Our team surveyed several low-speed rail sidings before finding a suitable option in Gooding. Once we found a good route from Gooding to Jerome, our crew made it look easy.

On the route, we lowered the trailer under several low obstacles, raised it to move over humps in the road, and navigated through some very tight areas. Our 125-ton dual lane perimeter deck trailer was just the right machine for this kind of job: it’s capable of raising and lowering up to four feet. Additionally, every axle is able to steer, which makes it extremely versatile for avoiding obstacles.

THE TRANSLOAD AND THE OFFLOAD

Our crew used our 400-ton jack and slide system to transload the 249,000-pound transformer from the railcar to our trailers. We utilized both a push and pull truck with our dual-lane trailer on route. Once we arrived in Jerome, we again used the jack and slide to set the unit on a pad. Once the unit was set, we offloaded all accessories from our trailer. The team navigated the route safely and soundly, and all went off without a hitch.

Although every transformer is almost identical, no two moves are the same. Each location has a unique terrain that poses its own unique challenges. That is why our transportation and logistics services team is careful to perform surveys before the project begins — they are critical to the planning process. Once the challenges are identified, our team works together to eliminate them one by one for a successful move.

We’re pleased to report that our customer was very satisfied with the move, and as a result, has engaged us on several projects since. The Omega Morgan team is happy to be able to support new customers in the Boise area; it’s an opportunity to serve some of the best in the west.

Case Studies | Logistics

A Quick Turnaround: Transporting a 300,000 Pound Transformer from Cornelius OR

Industry Utilities

Equipment Used 2015 Kenworth C500 prime mover, t-bar jeep from our high frame trailer, 150 ton trailer with torque tubes, 2016 Kenworth T800 tri drive tractor push truck

Description To avoid potential power outages, a transformer needed to make it from a rail siding in Cornelius, OR, to a substation in Sherwood within 2 weeks. Between permit and route challenges and an ever tightening time frame, our transportation and logistics services team worked efficiently to make a safe and timely delivery.

Full Case Study

Case Studies | Logistics

A Coordinated Effort: Transporting and Unloading a Shunt Reactor in British Columbia Canada

Industry Energy

Equipment Used 2015 Kenworth C500, 150-ton trailer, push truck

Description Omega Morgan’s transportation and logistics services crews out of Calgary used sharp planning and careful coordination to transport and set a 213,000-pound shunt reactor at a hydroelectric generating station in British Columbia.

Full Case Study

Case Studies | Logistics

507,000 Pound Transformer to Barge Move

Industry Power Generation

Equipment Used 10-line Platform Trailer, Jack & Slide System, 286’ x 78’ Barge, Roro Ramps

Description Our transportation and logistics services crew provided a turn-key solution for a client in need: planning and executing a process to move a 507,000 pound transformer. In addition to jacking and sliding the large transformer onto an Omega Morgan 10-line platform trailer and navigating its transport over a railroad crossing, our team prepared the transformer for transport overseas.

Full Case Study

Case Studies | Logistics

Complex Compressor Transportation From California to Canada

Industry Oil & Gas

Equipment Used Stretch Cozad 9 Axle Trailers, Faymonville HWY MAX

Description Omega Morgan worked with one of the largest North American oil and gas companies to move two 100,000 pound compressors along with more than 25 loads of ship-loose materials from California and two over-dimensional coolers from Texas to Taylor, BC.

Full Case Study

Case Studies | Logistics

Transportation and Logistics – Fraser Surrey Docks Compressor Transport

Industry Oil & Gas

Equipment Used Four-Axle Tractor, 150-Ton Dual Lane Trailer, two tri-drive push trucks

Description We hauled three compressor packages totaling 216’L x 18’W x 15’8”T at 181,000 lbs. from Fraser Surrey Docks, Fraser Surrey British Columbia to the following three locations in BC: Merritt, 93 Mile, and Chilliwack. This project was the heaviest piece permitted and successfully hauled through the British Columbia Interior on the chosen route to date.

Full Case Study

Have a Similar Project? Contact Omega Morgan