Installing a Hot Isostatic Press in Canby, Oregon

Industry: Fabricated Metal Products
Project Location: Canby, OR
Services Used: Machinery Moving
Equipment Used: (4) Posts of a 250 Ton Gantry System
Project Type: Hot Isostatic Press Installation

Kittyhawk Products, a hot isostatic pressing company based out of Garden Grove, CA, was charting new territory: the small, family-run business recently opened a second manufacturing facility in Canby, OR. The company provides services to the casting industry, and opening this new facility would allow them to serve their growing customer base in the Pacific Northwest.

This exciting growth would include the installation of four potential presses in the new facility–and Omega Morgan’s Portland machinery moving crews were called upon to install the first of these four new presses.

Space was tight and delays presented challenges, but this is where our machinery moving crews shine.

The Challenge: Installing a Large Hot Isostatic Press with Tight Positioning Requirements

Moving a Large Manufacturing Press

The first item we needed to tackle was the extremely tight workspace. The rigging challenge was unique; we weren’t able to open any penetrations in the roof to lower the press in by crane from the outside. Even if we uprighted the press outside, it was too tall and the facility’s doorways were too short to move it indoors.

Facility Access Challenges

It was no easier inside the facility–there wasn’t enough headroom to upright the press without utilizing the pit the presses would sit in once they were installed. The headroom limited our gantries to under eight feet of stroke, making the process of uprighting the 16-foot-long vessel very complex.

Permitting Challenges

Delays also cropped up, threatening to cost valuable time. Transportation of the press was held up due to permitting. This delay could set off a cascade of other delays; manufacturer’s representatives and other trades were all scheduled to do work based on the original delivery date–which now looked very much in question.

The Solution: Careful Planning to Meet Tight Deadlines in Confined Spaces

Careful planning, specialized rigging, and a custom lifting solution allowed Omega Morgan to complete the installation safely while keeping the project on schedule.

Machinery Moving Planning

Before work began, the team carefully calculated rigging lengths to ensure the lift could be completed safely within the facility’s tight clearances.

Specialized Rigging

We executed the move using our custom-built, 250-ton gantry—an Omega Morgan designed and fabricated lifting bracket.

Precision Equipment Placement

The hot isostatic press was carefully lifted, uprighted, and positioned within the confined workspace to meet the project’s tight installation requirements.

Installation Coordination

To make sure the customer wouldn’t be affected by the shipping delays, Omega Morgan’s crews worked long hours into the nights and weekends so the press would be installed on time. We were intent on doing whatever we had to do to reduce any delays to the project.

The Result: Delivered a Successful Installation Ready for Manufacturing Operations

Despite challenging site conditions and transportation delays, Omega Morgan completed the installation while keeping the customer’s expansion project moving forward.

  • Successfully installed the first hot isostatic press
  • Customer schedule maintained despite shipping delays
  • Precision equipment placement in a confined workspace
  • Completed safely with no reported safety incidents

We’re thrilled to have had the opportunity to support Kittyhawk’s growth and expansion into the Pacific Northwest with the installation of this hot isostatic press, and we’re proud of our machinery moving team for using their expertise to ensure the complex installation happened smoothly and on time.

Related Case Studies

Out with the Old: Removing and Replacing a Massive Autoclave in Arlington WA

Industry Manufacturing

Equipment Used Tri-lifter, jack and skate system, and SPMT.

Description In the process of upgrading its manufacturing equipment, a telephone pole pressure treating manufacturer needed a full-service company to remove a 160,000-pound autoclave before transporting and installing a new 230,000-pound autoclave in the same place. Omega Morgan’s Seattle machinery moving crew, with support from the specialized transportation and crane teams, delivered a turnkey solution.

Full Case Study

Long-Term Machinery Moving: Relocating Over 115 Spindle Machines

Industry Manufacturing

Equipment Used Forklifts: 15K, Hoist 40/60, and Versilift 60/80. Tractors: 3 and 4-axle trucks along with lowboy, step deck, and double drop trailers

Description Relocating to a facility in Lakewood, WA, a manufacturer needed a machinery moving team that could deliver expertise and flexibility over a long time period, without costing production value. Over a year and a half later, Omega Morgan has transported the majority of the components, including 115 spindle machines, while continuing to move one load a week as the job wraps up.

Full Case Study

Lift and Drift: A Unique Solution for Installing Power Skids at the JE Dunn Data Center

Industry Manufacturing

Equipment Used (1) 200-ton crane, rolling blocks, chain falls, skates

Description Using a not-often-seen technique that aided with both space and cost savings, Omega Morgan’s Portland-based machinery moving crews assisted with the installation of power skids at the JE Dunn Data Center in Hillsboro, OR.

Full Case Study

Setting up Equipment for the Northwest Machine Tool Expo

Industry Machining and Manufacturing

Equipment Used (1) 5k Forklift, (2) 8k Forklifts, (2) 15k Forklifts, (1) 30k Forklift, (1) 23/35 Versa Lift, (1) 40/60 Versa Lift & (3) Gear Trailers

Description As the official rigging provider for the NW Machine Tool Expo in Portland, Oregon, Omega Morgan’s Machinery Moving team moved 80 various machine tools into place for all of the vendor booths at this year’s event. Even with only two days to set up all the machine tools at the show, our experienced crews tackled this project with ease.

Full Case Study

Have a Similar Project? Contact Omega Morgan

Get a Quote